Go to content Go to navigation Go to search

No Bid Contracts are “Putting Troops At Risk”

July 13th, 2007 by CD

This is not the firs time I have reported on this issue.  But this issue deserves more attention.  It is amazing how the media will try to dig up the facts about M. Moore but not even look at the lies the government is spreading day in and day out.

 

From Bob Geiger:

A study completed in late June by the Pentagon’s Inspector General concludes that the Department of Defense (DoD) has risked the lives of U.S. troops in Iraq due to malfeasance in awarding and monitoring contracts for badly-needed armored vehicles.

The study, which was requested by Democratic Congresswoman Louise Slaughter of New York, found that since 2000 the DoD has awarded “sole-source” contracts valued at $2.2 billion to just two companies, Force Protection, Inc.(FPI) and Armor Holdings, Inc (AHI).

Inspector General auditors found that the Marine Corps Systems Command (MCSC) made these two companies the sole providers of armored vehicles and armor kits for troops, despite knowing that other suppliers may have produced the equipment so desperately needed in Iraq substantially faster. Both manufacturers fell far behind delivery schedules, while AHI also produced inadequate and faulty

 

Read more here…


Parse error: syntax error, unexpected T_STRING in /home/cinta19/public_html/wp-content/themes/Sapphaire/comments.php on line 7